Loading...

Loading...

Dos Bocas Refinery Still Operates Below Capacity
By MBN Staff - Fri, 01/16/2026 - 16:07
PEMEX’s flagship Dos Bocas refinery continues to operate below its designed capacity more than a year after the start of its operations.
https://mexicobusiness.news/tag/dos-bocas
More Oil & Gas
PEMEX Reports Spill: The Week in Oil and Gas
By Perla Velasco - Fri, 05/09/2025 - 13:01
PEMEX has confirmed and contained two oil leaks on a key pipeline connecting to the Dos Bocas Maritime Terminal.
Security Assessment / Oil Spill in Dos Bocas
By Fernando Mares - Thu, 05/08/2025 - 13:04
President Claudia Sheinbaum reported an oil spill near Tabasco's coast from an old pipeline, estimated at around 300b.
Fitch Cites PEMEX as Financial Concern: The Week in Oil and Gas
By MBN Staff - Thu, 04/24/2025 - 14:03
Fitch Ratings has reaffirmed Mexico’s sovereign credit rating. However, the outlook is clouded by growing concerns over PEMEX.
Dos Bocas Exports First ULSD Shipment
By MBN Staff - Wed, 04/23/2025 - 11:39
Mexico exported its first-ever shipment of ultra-low-sulfur diesel (ULSD) from the Dos Bocas refinery due to lacking infrastructure for domestic use.
Tariffs Impact the Industry: The Week in Oil and Gas
By Perla Velasco - Thu, 04/03/2025 - 09:19
Clariant shifts production from Mexico to the US due to Trump’s tariffs.
Olmeca Refinery to Process 220Mb/d by End of March
By MBN Staff - Thu, 03/27/2025 - 16:51
Dos Bocas is still ramping up operations, processing 220Mb/d of crude and expected to hit full capacity in 2025.
IOC Partnerships Key to Mexico's Oil and Gas Success: Oilmex
By Perla Velasco - Thu, 02/27/2025 - 12:19
Oilmex Energy’s Ramiro Rodríguez sees a future in collaboration with IOCs, which he says could complement PEMEX’s operations.
Química Apollo Files Legal Dispute Against Dos Bocas
By MBN Staff - Wed, 02/26/2025 - 11:16
Química Apollo filed a legal complaint against PEMEX regarding the withdrawal of a contract for desalinating and dehydrating crude oil at Dos Bocas.
Interoceanic Corridor to Be Fully Operational by 1H26
By Adriana Alarcón - Wed, 02/19/2025 - 16:15
The Interoceanic Corridor is expected to be fully operational by 1H26, integrating rail, ports, and industry to boost trade.